What your architect needs from the solar contractor before the energy filing
Insight · Published · R Solar Solutions
Questions? Call Jack at (646) 535-8762
Serving Brooklyn, Manhattan, Queens, The Bronx, Staten Island, Long Island and Westchester.
The checklist
Capacity calculation (three largest floors x 0.75 W) and the designed kW DC. Roof plan with array, setbacks, bulkheads and equipment. Shading or obstruction analysis if claiming an exception. Inverter listing (IEEE 1547 / UL 1741) and single-line diagram. Separate metering of the renewable system, tied into the building's energy monitoring. Off-site procurement method and REC documentation, if used. A short narrative of the compliance path.
Who does what
We prepare the solar layout, capacity calculation, single-line and equipment data; your architect and energy consultant include them in the filing.
Common questions
Can you work from schematic drawings?
Yes. We give a first layout and capacity calc from the roof plan and update it at DD and CD.
Questions? Call Jack at (646) 535-8762
Serving Brooklyn, Manhattan, Queens, The Bronx, Staten Island, Long Island and Westchester.
Sources: NYC DOB: 2025 NYCECC lighting & power guide · NYC DOB: 2025 NYCECC Chapter C4 (C405.15)
This page is general information, not tax, legal or engineering advice. Incentives change — confirm eligibility with your tax advisor. R Solar Solutions is operated by P National Group LLC, 1 Northside Piers, Brooklyn, NY 11249. Incentive information is general and not tax advice.
Related
News · March 30, 2026
DOB is now enforcing the 2025 NYC Energy Code — and its solar requirement
Since March 30, 2026, new NYC job filings must meet the 2025 Energy Code, including the C405.15 on-site solar minimum. What changed and who it hits.
News · January 30, 2026
NYC adopts an Existing Building Code, effective July 17, 2027 — what it means for solar
NYC adopted a new Existing Building Code alongside the 2025 Energy Code. It governs alteration filings from July 17, 2027. Where solar comes in for additions and roof work.
News · November 18, 2026
NYSERDA rolls out $200 million in new NY-Sun solar incentives
NYSERDA announced a $200 million NY-Sun framework in October 2026 and outlined new incentive blocks in November. What it covers and what it means for NYC buildings.
News · September 25, 2026
95% of large NYC buildings meet Local Law 97 limits — tougher 2030 limits are next
The city says 95% of large private buildings met Local Law 97 emissions limits. With stricter 2030 limits ahead, here is where rooftop solar fits.
The 2025 NYC Energy Code solar requirement (C405.15), explained
New NYC buildings filed from March 30, 2026 need 0.75 W of solar per sq ft of floor area (up to the three largest floors) or off-site renewables. Rules, exceptions and a calculator.
Solar EPC for developers and general contractors
One subcontract for design, equipment, install and interconnection — built for developers and GCs.