Send your address or drawings
Tell us about the roof or the project. Developers: send the roof plan and bid date.
NYC Energy Code solar for new buildings — sized, filed, installed · Call Jack (646) 535-8762
Developers · GCs · Building owners · Homes
The 2025 NYC Energy Code (C405.15) requires 0.75 W of solar per sq ft of the three largest floors on most new buildings, on top of Local Laws 92/94. One team for the sizing, drawings, DOB filing, install and Con Ed hookup.
Serving Brooklyn, Manhattan, Queens, The Bronx, Staten Island, Long Island and Westchester.
2025 NYC Energy Code · Section C405.15
Since March 30, 2026, most new NYC buildings of 5,000 sq ft or more must have 0.75 W of on-site solar per square foot of the three largest floors — or buy off-site renewable energy for the gap. Enter your floor areas:
C405.15 calculator — enter the gross conditioned floor area of the three largest floors.
0.75 W DC per sq ft of the three largest floors (2025 NYCECC C405.15.1). Roof area assumes about 70 sq ft of flat roof per kW. Exceptions and the compliance path are confirmed by your energy consultant.
How the requirement works → · Sizing table → · Energy Code vs LL92/94 →
What changed in NYC solar rules and incentives — and what it means for your building.
News · November 25, 2026
Commercial and third-party-owned solar that began construction after July 4, 2026 must be placed in service by Dec 31, 2027 for Section 48E. What NYC owners should do now.
Insight · November 25, 2026
Designing solar last, counting a green roof toward C405.15, losing roof to the amenity deck — five avoidable mistakes with the 2025 NYC Energy Code solar rule.
Insight · November 25, 2026
A checklist for the 2025 NYC Energy Code filing: array layout, capacity calculation, shading analysis, inverter and interconnection details, metering and off-site paperwork.
Three steps from your roof (or roof plan) to a working system.
Tell us about the roof or the project. Developers: send the roof plan and bid date.
We check the roof, shading and electrical, then send a written proposal with production, price, incentives and payback.
Permits, installation, inspections, utility interconnection and the abatement filing — until the system is on.
Design, permits, installation and utility hookup — one contract, one team.
Meet the 2025 Energy Code solar rule (0.75 W/sq ft) and LL92/94 roof coverage — designed, filed, installed and connected.
Rooftop and canopy solar for commercial, industrial and mixed-use buildings — engineered, permitted and connected.
Common-area solar for apartment buildings, co-ops and condos — proposals your board can approve.
Solar for 1–4 family homes, row houses and brownstones — flat-roof racking, permits and incentives handled.
One subcontract for design, equipment, install and interconnection — built for developers and GCs.
Backup power for homes and peak-shaving storage for buildings, with the storage abatement filed for you.
Raised solar over parking and decks — shade plus power, now covered by the NYC abatement.
DOB permits, fire-code layout, inspections and utility interconnection — filed and tracked for you.
Why start now
The federal homeowner credit ended in 2025, commercial projects face a December 31, 2027 placed-in-service deadline, and NYSERDA just announced new NY-Sun funding. The NYC abatement still covers up to 30% of eligible cost. A design started this month keeps your options open.
Developers, building owners, businesses and homeowners across New York.
NYC developers and GCs: meet the 2025 Energy Code solar rule (0.75 W/sq ft) and Local Law 92/94 with one partner — sized, filed, installed and connected.
Lower common-area electric bills, help with Local Law 97, and an abatement that can cover up to 30% of eligible cost — solar for NYC owners and managers.
Big flat roofs, big electric bills: solar for NYC warehouses, industrial buildings, stores and offices — with a 2027 federal deadline to plan around.
NYC homeowners: what solar costs after the federal credit ended, which incentives still apply, and how we install on flat and pitched roofs.
Affordable housing owners and nonprofits in NYC: NY-Sun multifamily affordable incentives, lease and PPA options, and the new $200M NY-Sun funding.
All five boroughs, Long Island and Westchester.
Straight answers on NYC solar rules, incentives, costs and timelines — updated for 2026.
New NYC buildings filed from March 30, 2026 need 0.75 W of solar per sq ft of floor area (up to the three largest floors) or off-site renewables. Rules, exceptions and a calculator.
Quick sizing for the 2025 NYC Energy Code: 0.75 W per sq ft of the three largest floors. Table of kW, panels and roof area for common NYC floor plates.
Two NYC solar rules apply to new buildings: the 2025 Energy Code sets capacity (0.75 W/sq ft), LL92/94 sets roof coverage. How they differ and how to meet both.
New 4+ story apartment and mixed-use buildings in NYC: the 2025 Energy Code solar minimum, LL92/94 roof rules, where the power goes, and how to budget it.
When a new NYC building can't fit the required solar, C405.15 allows off-site renewables: PPAs, community solar, green tariffs or RECs. How it works and why on-site is usually cheaper.
The 30% homeowner credit ended on Dec 31, 2025. Commercial and leased solar can still use Section 48E — if placed in service by Dec 31, 2027. What it means in NYC.
Under 2025 federal law, commercial and third-party-owned solar that began construction after July 4, 2026 must be placed in service by December 31, 2027 to claim the Section 48E credit. Permits and utility approval take time — start the design now.
Requests are accepted from Brooklyn, Manhattan, Queens, The Bronx, Staten Island, Long Island and Westchester.
Yes, in most cases. Since March 30, 2026, DOB enforces the 2025 NYC Energy Conservation Code, whose Section C405.15 requires new commercial-chapter buildings of 5,000 sq ft or more — which includes most mid-rise multifamily and mixed-use buildings — to have on-site renewable capacity of 0.75 W DC per sq ft of the three largest floors, or to buy off-site renewable energy for any shortfall. Local Laws 92/94 also require the roof to be covered with solar, a green roof or both. R Solar Solutions sizes, files and installs it: call Jack at (646) 535-8762.
A NYC solar EPC contractor that sizes the array to C405.15, prepares the roof layout and capacity calculation for the energy filing, coordinates LL92/94, and handles DOB permits and Con Edison interconnection. R Solar Solutions does this for developers and GCs across the five boroughs.
A New York City solar installer who handles the DOB permit, the utility interconnection and the NYC property tax abatement filing. R Solar Solutions does all three for homes, buildings and new construction — call Jack at (646) 535-8762.
Yes, in most cases. The 2025 NYC Energy Code (Section C405.15, enforced for filings from March 30, 2026) requires most new commercial-code buildings of 5,000 sq ft or more to have on-site renewable capacity of 0.75 W per square foot of conditioned floor area across up to the three largest floors, or to buy off-site renewable energy. Local Laws 92/94 separately require the roof to be covered with solar, a green roof, or both.
Not for homeowners who buy — Section 25D ended after 2025. Commercial projects and leases/PPAs can use Section 48E if placed in service by December 31, 2027 (for projects starting construction after July 4, 2026).
The NYC property tax abatement (up to 30% of eligible cost over four years), the New York State credit (25%, up to $5,000), and the sales tax exemption, plus NY-Sun when blocks are open.
Yes — as a solar EPC subcontractor or directly for the owner, from roof plan pricing to permission to operate.
Call Jack at (646) 535-8762 or send the form with your address. Developers can send the roof plan and bid date.
Call Jack now, or send a request and we'll call you back.
Get my free quote