Call Jack · (646) 535-8762

Solar service

Solar for new buildings: 2025 Energy Code + LL92/94

Solar for new buildings: 2025 Energy Code + LL92/94

Updated · R Solar Solutions

Quick answer: New NYC buildings now face two solar rules. Local Laws 92/94 require the available roof to be covered with solar, a green roof, or both. And the 2025 NYC Energy Conservation Code (enforced for filings from March 30, 2026) adds Section C405.15: most new commercial-code buildings of 5,000 sq ft or more need on-site renewable capacity of 0.75 W per square foot of conditioned floor area, counting up to the three largest floors — or must buy off-site renewable energy instead. We size the array to meet both, file the paperwork and install it.

Questions? Call Jack at (646) 535-8762

Serving Brooklyn, Manhattan, Queens, The Bronx, Staten Island, Long Island and Westchester.

The 2025 Energy Code solar requirement (C405.15)

Buildings designed under the commercial chapter of the 2025 NYCECC must have on-site renewable systems with a DC nameplate capacity of at least 0.75 W per square foot of gross conditioned floor area, using the sum of the three largest floors. Example: a building whose three largest floors total 30,000 sq ft needs about 22.5 kW. Additions must meet it for the addition alone.

Exceptions include buildings under 5,000 sq ft of conditioned floor area, roofs more than 80% covered by permanent obstructions, and roofs more than half shaded for long periods. Exempt buildings, or buildings that can't fit the full capacity, must procure off-site renewable energy (power purchase agreements, community renewables, green tariffs and similar) under long-term contracts, or buy certified renewable energy before occupancy.

In the energy code, "commercial" covers most buildings other than low-rise (three stories or less) residential, so typical NYC mid-rise multifamily and mixed-use projects are included. Your energy consultant confirms the compliance path.

Local Laws 92/94: the roof coverage rule

The requirement applies to new buildings, vertical or horizontal enlargements, and alterations that replace an entire existing roof deck or roof assembly. The roof area that remains after setbacks, mechanical equipment and other required areas is the sustainable roofing zone, and it has to be covered with solar, a green roof, or a mix.

A green roof can satisfy LL92/94, but it doesn't produce electricity — so under the 2025 Energy Code a green-roof-only design generally means buying off-site renewable energy instead. For most projects, solar sized to C405.15 is the simpler way to meet both rules.

Small roofs can be exempt: if the area can't hold at least 4 kW of solar or 200 square feet of green roof (a lower 100-square-foot threshold applies to some low-rise residential buildings), the requirement may not apply. The exact rules are in DOB Buildings Bulletin 2019-010, and your architect certifies compliance on the LL92/94 form before plan approval.

Where we fit in your project

We work from your architect's roof plan early, so the array, conduit runs, inverter location and electrical room space are designed in, not squeezed in after the bulkheads are poured. We size the system, produce the solar drawings and structural letters, and coordinate the electrical tie-in with your electrician of record.

After installation we handle the utility side — the interconnection application, inspections and permission to operate — and file the NYC property tax abatement paperwork so the owner gets the benefit.

Why developers call us early

Solar decided at the last minute costs more: extra roof penetrations, longer wire runs, and a system sized to whatever space is left. Brought in at design development, the array usually fits better, produces more and is cheaper per watt.

We are run by a Brooklyn developer and builder, so we understand schedules, lenders and TCO deadlines — and we plan around them.

Common questions

How much solar does the 2025 NYC Energy Code require?

For buildings covered by C405.15: 0.75 W of DC capacity per square foot of gross conditioned floor area, counting up to the three largest floors. Use our calculator in the Energy Code guide for a quick number.

When does the 2025 NYC Energy Code apply?

DOB began enforcing it for job filings submitted on or after March 30, 2026. Filings with complete energy submissions before that date can follow the 2020 code.

Does Local Law 92/94 apply to my project?

It applies to new buildings, enlargements, and alterations that replace the entire roof deck or roof assembly. Repairs that don't replace the whole roof generally don't trigger it. Send us the scope and we'll tell you what applies.

Can I do a green roof instead of solar?

Yes — the law allows solar, a green roof, or a combination. Solar usually pays back through lower bills and the NYC property tax abatement; we can price both.

When do I need the solar design?

Before plan approval, because the LL92/94 compliance form is filed with the application. The earlier we see the roof plan, the better the array fits.

Questions? Call Jack at (646) 535-8762

Serving Brooklyn, Manhattan, Queens, The Bronx, Staten Island, Long Island and Westchester.

Sources: NYC DOB: 2025 NYCECC Chapter C4 (C405.15) · NYC DOB: 2025 NYCECC lighting & power guide · NYC DOB: 2025 NYCECC enforcement notice · NYC DOB: Local Laws 92/94 Solar & Green Roofs · NYC DOB: Buildings Bulletin 2019-010 · NYC 311: Green roof and solar requirements

R Solar Solutions is operated by P National Group LLC, 1 Northside Piers, Brooklyn, NY 11249. Incentive information is general and not tax advice.

Related

Call Jack nowFree quote