Quick answer: Every NYC solar system needs a DOB permit, has to keep fire-code access paths clear on the roof, and must be approved by the utility before it can be switched on — Con Edison in the five boroughs and most of Westchester, PSEG Long Island on Long Island. We prepare and file all of it, schedule the inspections, and don't call the job done until you have permission to operate.

Questions? Call Jack at (646) 535-8762

Serving Brooklyn, Manhattan, Queens, The Bronx, Staten Island, Long Island and Westchester.

Why paperwork decides the schedule

On most NYC projects the install itself is the short part. Permits, interconnection review and the final utility sign-off take longer, and a missing document can stall a project for weeks. We file complete packages the first time and track every step for you.

Common questions

How long does interconnection take?

It varies by utility, system size and grid conditions. Small residential systems move faster than large commercial ones. We give you a schedule at contract and keep it updated.

Do I deal with Con Edison myself?

No — we file the interconnection application and coordinate the meter work. You sign the utility forms we prepare.

Questions? Call Jack at (646) 535-8762

Serving Brooklyn, Manhattan, Queens, The Bronx, Staten Island, Long Island and Westchester.

Sources: NYC DOB: Solar projects

R Solar Solutions is operated by P National Group LLC, 1 Northside Piers, Brooklyn, NY 11249. Incentive information is general and not tax advice.

Related

Call Jack nowFree quote