How long does solar take in NYC, from contract to power?

How long does solar take in NYC, from contract to power?

Updated · R Solar Solutions

Quick answer: An NYC solar project goes from site survey to design, DOB permit, installation, inspection and the utility's permission to operate. The installation itself is often a few days for a home and a few weeks for a large building; permits and utility interconnection usually take longer than the install. We give you a written schedule at contract.

Questions? Call Jack at (646) 535-8762

Serving Brooklyn, Manhattan, Queens, The Bronx, Staten Island, Long Island and Westchester.

Step by step

  1. Site survey. Roof, structure, shading and electrical check.
  2. Design and proposal. Layout, production estimate, price and incentives.
  3. Permits and interconnection. DOB filing and utility application.
  4. Installation. Racking, panels, inverters and wiring.
  5. Inspection. City and utility inspections.
  6. Permission to operate. The utility approves and the system is turned on.

What causes delays

Incomplete permit filings, roof work that needs to happen first, equipment lead times, and utility review for larger systems. For commercial projects chasing the December 31, 2027 federal deadline, starting early matters.

Common questions

Can I use the system before permission to operate?

No. The utility must approve the connection before the system is switched on.

Questions? Call Jack at (646) 535-8762

Serving Brooklyn, Manhattan, Queens, The Bronx, Staten Island, Long Island and Westchester.

This page is general information, not tax, legal or engineering advice. Incentives change — confirm eligibility with your tax advisor. R Solar Solutions is operated by P National Group LLC, 1 Northside Piers, Brooklyn, NY 11249. Incentive information is general and not tax advice.

Related

Call Jack nowFree quote